S35 · Crisis & Emergency Response

Declared state: half-built — system-level crisis protocols exist, *owner*-level does not.

This is the repository plan and evidence, not a live health reading. A task marked done may still depend on credentials, devices, deployment or a newer acceptance test.

Dependencies

S13

Tasks and gates

35.F1 · An explicit emergency classifier with a **conservative** threshold and a manual trigger

Tier F · done · Verification: hermetic-test

Gate: `test_emergency_path.py` — false-positive rate 0 on 50 ordinary prompts.

  • recorded-note · 2026-09-13 · docs/SYSTEMS-DETAILS.md:3591

35.F2 · An emergency contact list and a defined action per category, stored locally.

Tier F · done · Verification: hermetic-test

Gate: `test_emergency_path.py` [contacts resolved offline]

  • recorded-note · 2026-09-13 · docs/SYSTEMS-DETAILS.md:3608

35.F3 · System-level protocols (ragnarok/phoenix) remain drill-tested.

Tier F · done · Verification: hermetic-test

Gate: `test_protocol_drills.py`

  • unverified-import · undated · docs/SYSTEMS-DETAILS.md:3623

35.R1 · Escalation ladder: notify → call → contact a third party, each with a stop condition. No outbound voice calls: the system calls people, it does not converse with them (D-11).

Tier R · open · Verification: hermetic-test

Gate: `test_emergency_path.py` [ladder]

    35.R2 · Silence detection — a missed check-in after an at-risk signal triggers the ladder.

    Tier R · open · Verification: hermetic-test

    Gate: `test_deadmans_switch.py` extended.

      35.R3 · Post-incident record written automatically. *gate:* `test_protocol_reports.py`

      Tier R · done · Verification: hermetic-test

      Gate: `test_emergency_path.py` [incident] - every alarm writes incidents/<when>-<category>.md after the ladder: when, the tripping phrase, reached / not reached, what he was told, a place for the outcome; a failed write never costs the alarm.

      • hermetic-green · 2026-10-17 · bench/test_emergency_path.py

      35.E1 · Two rehearsed drills (one voice-triggered, one silence-triggered) completed end to end.

      Tier E · open · Verification: manual

      Gate: recorded drills.

        HUD screen contracts

        All subsystems · Source: docs/systems-plan.json.